Project Background
Shenzhen China Merchants Bonded Logistics Co., Ltd. Is joint venture of China Merchants Holdings (International) Company Limited and Shenzhen Chiwan Wharf Holdings Limited. The company provides warehousing, distribution, 3PL (excluding DG cargo) such as consolidation, customs declaration, insurance and transport consultancy services.
Merchants Maritime (Shenzhen) Bonded Logistics Center (phase III) located in Qian Hai Bay Logistics Park which is adjacent to container terminal and warehouse (phase I & II). The phase I is a single-floor warehouse and running while the phase II warehouse consists of two floors and will operate soon. The construction area of phase III is about 43,000 square meters.
Project Summary
For meeting the current market situation, change in operation mode and emerge of potential market demand, Shenzhen China Merchants Bonded Logistics Co., Ltd invited BPS to develop a conceptual and functional design on Merchants Maritime (Shenzhen) Bonded Logistics Center (phase III) by using advanced supply chain optimization techniques and industrial engineering techniques while considering existing operation flow.
In order to ensure the project meeting with customer requirement, BPS collected detailed information for analysis and proposed following design concept :
Investment Term
BPS considered the sustainability of this project. Beside developing conceptual and functional design for phase III, the necessary planning and design for the phase IV development also be considered.
Through this project, BPS helped Shenzhen China Merchants Bonded Logistics Co. to develop an advanced logistics center with reasonable investment which is beneficial for the business development for the company and the development logistics industry within the region as well.